单项选择题
A. Restart both servers at the same time so the servers are down at the same time.
B. DC server first, then the Exchange server second.
C. The order in which the servers are restarted does not matter.
D. Exchange server first, then the DC server second.
多项选择题 Whichofthefollowingportssupportshotplugdevices?()
单项选择题 WhichofthefollowingRAIDlevelsprovideshighperformanceandpotentiallyallowsforthesystem tocontinuerunningwithmultiplediskfailures?()
多项选择题 AserverconfiguredwithRAID5hasrecentlysufferedfromtwosimultaneousdiskfailures.Whichof thefollowingwouldberequiredtobringtheserverbacktooperationalstatus?()